Ōtāhuhu – Whakamaru A and B line reconductoring project

On 9 December 2025 Transpower New Zealand Limited (Transpower) submitted an application proposing an increase in its base capex allowance to reconductor the Flatbush to Hūnua section (31km) of the Ōtāhuhu Whakamaru (OTA WKM) A and B transmission lines in Auckland due to conductor corrosion issues. Transpower’s cost estimate for the project is $50.5 million ($ nominal).

Transpower is seeking our approval to add $50.5 million ($ nominal) to its base capex allowance for the regulatory control period from 1 April 2025 to 31 March 2030 (RCP4).