In the High Court’s decision on the merits appeals of the input methodologies, the Court commented on the Commission's selection of the 75th percentile of the cost of capital range for price-quality regulation of electricity lines and gas pipeline businesses (see Wellington International Airport Ltd and others v Commerce Commission [2013] NZHC 3289). The Commission has also received correspondence from MEUG and BARNZ inquiring as to the Commission's proposed response.
Given the uncertainty that now exists in relation to this significant aspect of the cost of capital, the Commission appreciates that there would be some benefit in considering this issue further and reaching a decision prior to the November 2014 setting of the DPP for electricity distribution businesses and the Transpower IPP.
For information on the input methodologies review, see the input methodologies review page. Note that consideration of the WACC percentile for airport services will now be made as part of the review of input methodologies
Documents
Decision to consider the WACC percentile for airport services as part of the IM review
10/06/2015 (1 documents)
Further work on the cost of capital input methodologies for airports
27/02/2015 (1 documents)
Final decision on the WACC percentile for information disclosure for electricity lines and gas pipelines
12/12/2014 (2 documents)
- [2014] NZCC 38 Electricity Lines Services and Gas Pipeline Services IM Determination Amendment WACC percentile for ID regulation 2014 – 12 Dec 2014 PDF (4.4 MB)
- Published on 12 December 2014
- Amendments to the WACC percentile range for ID regulation for electricity lines services and gas pipeline services – Reasons paper – 12 Dec 2014 PDF (151 KB)
- Published on 12 December 2014
Cross-submissions on the WACC percentile for information disclosure for electricity lines and gas pipelines
25/11/2014 (1 documents)
- Transpower – Cross-submission on WACC Percentile for ID for electricity and gas – 21 November 2014 PDF (368 KB)
- Published on 25 November 2014
Submissions on the WACC percentile for information disclosure for electricity lines and gas pipelines
17/11/2014 (4 documents)
- ENA – Submission on WACC Percentile for ID for electricity and gas – 14 November 2014 PDF (390 KB)
- Published on 17 November 2014
- NZ Airports – Submission on WACC Percentile for ID for electricity and gas – 14 November 2014 PDF (333 KB)
- Published on 17 November 2014
- Powerco – Submission on WACC percentile for ID for electricity and gas – 14 November 2014 PDF (105 KB)
- Published on 17 November 2014
- Vector – Submission on WACC Percentile for ID for electricity and gas – 14 November 2014 PDF (99 KB)
- Published on 17 November 2014
Final decision on the WACC percentile for price-quality regulation
30/10/2014 (12 documents)
- Commerce Commission – Amendment to the WACC percentile for price-quality regulation – Reasons Paper – 30 October 2014 PDF (1.8 MB)
- Published on 30 October 2014
- [2014] NZCC 27 Electricity Lines Services and Gas Pipeline Services Input Methodologies Determination Amendment WACC percentile for price quality regulation 2014 – 30 October 2014 PDF (1.8 MB)
- Published on 30 October 2014
- Analyst Briefing – Amendment to the WACC percentile – 30 October 2014 Microsoft Powerpoint Presentation (2.1 MB)
- Published on 30 October 2014
- RAB multiples analysis for the WACC percentile final decision Microsoft Excel Spreadsheet (29 KB)
- Published on 30 October 2014
- Ingo Vogelsang Review of WACC percentile final reasons paper 24 October 2014 PDF (431 KB)
- Published on 30 October 2014
- Oxera response to submissions on Input methodologies Review of the 75th percentile approach 27 October 2014 PDF (1.4 MB)
- Published on 30 October 2014
- Ingo Vogelsang Reply to Comments on paper On the economic effects of allowing a WACC above the midpoint 20 October 2014 PDF (309 KB)
- Published on 30 October 2014
- Economic Insights Regulatory prescendent for setting WACC within a range updated to respond to submissions 11 October 2014 PDF (897 KB)
- Published on 30 October 2014
- CEG on behalf of NZ Airports Errata report October 2014 PDF (365 KB)
- Published on 30 October 2014
- Vector WACC percentile consultation further information and correction to submission 7 October 2014 PDF (117 KB)
- Published on 30 October 2014
- Vector Horizon EV multiple analysis 7 October 2014 Microsoft Excel Spreadsheet (24 KB)
- Published on 30 October 2014
- Vector TLC EV multiple analysis 7 October 2014 Microsoft Excel Spreadsheet (28 KB)
- Published on 30 October 2014
Revised draft decision on the WACC percentile for information disclosure for electricity lines and gas pipelines
(1 documents)
Submissions on further evidence
03/10/2014 (20 documents)
- BARNZ – Submission on further evidence – 30 September 2014 PDF (327 KB)
- Published on 03 October 2014
- Covec on behalf of BARNZ – Submission on further evidence – 30 September 2014 PDF (532 KB)
- Published on 03 October 2014
- Consumer – Submission on Franks and Ogilvie advice – 30 September 2014 PDF (319 KB)
- Published on 03 October 2014
- ENA – Submission on further evidence – 30 September 2014 PDF (468 KB)
- Published on 03 October 2014
- Incenta on behalf of ENA – Comment on Professor Dobbs – 30 September 2014 PDF (56 KB)
- Published on 03 October 2014
- Russell McVeagh on behalf of ENA – Review of Franks and Ogilvie – 30 September 2014 PDF (167 KB)
- Published on 03 October 2014
- MEUG – Submission on further evidence – 30 September 2014 PDF (90 KB)
- Published on 03 October 2014
- IWA on behalf of MEUG – Submission on further evidence – 30 September 2014 PDF (128 KB)
- Published on 03 October 2014
- NZIER on behalf of MEUG – Submission on further evidence – 30 September 2014 PDF (664 KB)
- Published on 03 October 2014
- Molly Melhuish – Submission on further evidence – 30 September 2014 PDF (148 KB)
- Published on 03 October 2014
- NZ Airports – Submission on further evidence – 30 September 2014 PDF (425 KB)
- Published on 03 October 2014
- Russell McVeagh on behalf of NZ Airports – Review of Franks and Ogilvie – 30 September 2014 PDF (167 KB)
- Published on 03 October 2014
- Powerco – Submission on further evidence – 30 September 2014 PDF (148 KB)
- Published on 03 October 2014
- Houston Kemp on behalf of Powerco – Submission on further evidence – 30 September 2014 PDF (591 KB)
- Published on 03 October 2014
- Transpower – Submission on further evidence – 30 September 2014 PDF (501 KB)
- Published on 03 October 2014
- Frontier on behalf of Transpower – Submission on further evidence – 30 September 2014 PDF (927 KB)
- Published on 03 October 2014
- Webb Henderson on behalf of Transpower – Submission on further evidence – 30 September 2014 PDF (461 KB)
- Published on 03 October 2014
- Vector – Submission on NZIER cross-submission – 23 September 2014 PDF (252 KB)
- Published on 03 October 2014
- Vector – Submissions on further evidence from IWA and Professor Dobbs – 30 September 2014 PDF (166 KB)
- Published on 03 October 2014
- Sapere on behalf of Vector – Submission on further evidence – 30 September 2014 PDF (299 KB)
- Published on 03 October 2014
Final decision on the WACC determination date
29/09/2014 (2 documents)
- [2014] NZCC 24 Electricity Lines Services Input Methodologies Determination Amendment 2014 – 26 September 2014 PDF (1.2 MB)
- Published on 29 September 2014
- Amendment to the WACC determination date for electricity lines services including Transpower Reasons paper – 29 September 2014 PDF (140 KB)
- Published on 29 September 2014
Invitation for submissions on further evidence
19/09/2014 (3 documents)
- Commerce Commission – Further work on WACC – Invitation for submissions on further evidence – 19 September 2014 PDF (360 KB)
- Published on 19 September 2014
- Ian Dobbs – Comments on the Application of the Dobbs [2011] model – 17 September 2014 PDF (835 KB)
- Published on 19 September 2014
- NZIER on behalf of MEUG – Valuing investments in network reliability – 9 September 2014 PDF (597 KB)
- Published on 19 September 2014
Cross-submissions on draft decision
15/09/2014 (23 documents)
- BARNZ – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (444 KB)
- Published on 15 September 2014
- Covec on behalf of BARNZ – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014.PDF PDF (612 KB)
- Published on 15 September 2014
- Carter Holt Harvey – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (173 KB)
- Published on 15 September 2014
- Consumer NZ – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (62 KB)
- Published on 15 September 2014
- Contact Energy – Cross -submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (417 KB)
- Published on 15 September 2014
- ENA – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 15 September 2014 PDF (2.5 MB)
- Published on 15 September 2014
- Genesis Energy – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (47 KB)
- Published on 15 September 2014
- Infratil – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (826 KB)
- Published on 15 September 2014
- MEUG – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (192 KB)
- Published on 15 September 2014
- Franks and Ogilvie on behalf of MEUG – Commerce Commission review of WACC percentile Specific legal issues arising from submissions PDF (496 KB)
- Published on 15 September 2014
- IWA on behalf of MEUG – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (153 KB)
- Published on 15 September 2014
- IWA on behalf of MEUG – Horizon Energy 2009 Simmonds Report PDF (12 MB)
- Published on 15 September 2014
- NZIER on behalf of MEUG – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (600 KB)
- Published on 15 September 2014
- Molly Melhuish – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (328 KB)
- Published on 15 September 2014
- NZ Airports – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (564 KB)
- Published on 15 September 2014
- CEG on behalf of NZ Airports – Economic review of BARNZ and Covec – 12 September 2014 PDF (465 KB)
- Published on 15 September 2014
- Powerco – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (248 KB)
- Published on 15 September 2014
- Houston Kemp on behalf of Powerco – Analysis of selected submissions on the Commerce Commissions WACC percentile draft decision – 12 September 2014 PDF (570 KB)
- Published on 15 September 2014
- Progressive Enterprises – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (207 KB)
- Published on 15 September 2014
- Spark – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (204 KB)
- Published on 15 September 2014
- Transpower – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (557 KB)
- Vector – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (229 KB)
- Published on 15 September 2014
- Sapere on behalf of Vector – Cross-submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 12 September 2014 PDF (559 KB)
- Published on 15 September 2014
Frontier’s loss function simulation model
05/09/2014 (7 documents)
Download the user-friendly front-end for Frontier’s model. Frontier note: this should be read in conjunction with the covering note for the model interface, below.
- Frontier – Covering note for model interface – 11 September 2014 PDF (316 KB)
- Published on 15 September 2014
- Commerce Commission – instructions for the file formats – 5 September 2014 txt (321 bytes)
- Published on 05 September 2014
- Frontier – Model – Instruction – 5 September 2014 txt (1.6 KB)
- Published on 05 September 2014
- Frontier – Model – Simulation Core Code – 5 September 2014 txt (7.3 KB)
- Published on 05 September 2014
- Frontier – Model – Simulation Core Code for TPW – 5 September 2014 txt (7.3 KB)
- Published on 05 September 2014
- Frontier – Model – Transpower Run (CS Only) – 5 September 2014 csv (550 bytes)
- Published on 05 September 2014
- Frontier – Model – Transpower Run – 5 September 2014 csv (1.6 KB)
- Published on 05 September 2014
Submissions on draft decision
04/08/2014 (35 documents)
- Air NZ Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 1 September 2014 PDF (84 KB)
- Published on 02 September 2014
- AMP Capital Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (487 KB)
- Published on 02 September 2014
- BARNZ Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (374 KB)
- Published on 02 September 2014
- Covec on behalf of BARNZ Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (456 KB)
- Published on 02 September 2014
- Chorus Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (306 KB)
- Published on 02 September 2014
- CEG on behalf of NZ Airports and ENA Review of Covec Report – June 2014 PDF (685 KB)
- Published on 02 September 2014
- ENA Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (2 MB)
- Published on 02 September 2014
- Incenta on behalf of ENA Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (511 KB)
- Published on 02 September 2014
- ForsythBarr Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (440 KB)
- Published on 02 September 2014
- Meridian Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (90 KB)
- Published on 02 September 2014
- MEUG Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (229 KB)
- Published on 02 September 2014
- NZIER on behalf of MEUG Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (845 KB)
- Published on 02 September 2014
- IWA Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (573 KB)
- Published on 02 September 2014
- IWA on behalf of MEUG Grant Samuel Report to Prime Infrastructure – part 1 – 20 Sept 2010 PDF (6.2 MB)
- Published on 02 September 2014
- IWA on behalf of MEUG Grant Samuel Report to Prime Infrastructure – part 2 – 20 Sept 2010 PDF (7.5 MB)
- Published on 02 September 2014
- IWA on behalf of MEUG Cameron Partners report to Transpower – 16 August 2010 PDF (765 KB)
- Published on 02 September 2014
- IWA on behalf of MEUG Submission on Cost of Capital input methodologies – Augsut 2010 PDF (560 KB)
- Published on 02 September 2014
- NZ Airports Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (641 KB)
- Published on 02 September 2014
- CEG on behalf of NZ Airports Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (1000 KB)
- Published on 02 September 2014
- Orion Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (524 KB)
- Published on 02 September 2014
- Powerco Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (405 KB)
- Published on 02 September 2014
- HoustonKemp on behalf of Powerco Submission on Proposed amendment to the WACC percentile – 29 August 2014 PDF (815 KB)
- Published on 02 September 2014
- PwC Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (353 KB)
- Published on 02 September 2014
- QIC Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (500 KB)
- Published on 02 September 2014
- Transpower Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (1000 KB)
- Published on 02 September 2014
- Frontier on behalf of Transpower Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (836 KB)
- Published on 02 September 2014
- Frontier on behalf of Transpower Response to Economic Insights – 29 August 2014 PDF (383 KB)
- Published on 02 September 2014
- Castalia on behalf of Transpower Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (230 KB)
- Published on 02 September 2014
- Unison Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 1 September 2014 PDF (260 KB)
- Published on 02 September 2014
- Vector Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (448 KB)
- Published on 02 September 2014
- Sapere on behalf of Vector Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (943 KB)
- Published on 02 September 2014
- PWC letter to Vector on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (150 KB)
- Published on 02 September 2014
- Wellington Electricity Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (14 MB)
- Published on 02 September 2014
- CEG on behalf of Wellington Electricity Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (387 KB)
- Published on 02 September 2014
- WIAL Submission on Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 29 August 2014 PDF (37 KB)
- Published on 02 September 2014
Submissions on our proposal to amend the WACC determination date
02/09/2014 (2 documents)
- Transpower Submission on Proposed amendment to the WACC determination date for electricity lines services including Transpower – 29 August 2014 PDF (344 KB)
- Published on 02 September 2014
- Vector Submission on Proposed amendment to the WACC determination date for electricity lines services including Transpower – 29 August 2014 PDF (126 KB)
- Published on 02 September 2014
Draft decision on the WACC determination date
04/08/2014 (1 documents)
Draft decision
04/08/2014 (5 documents)
- Ingo Vogelsang – Review of Commerce Commission draft decision on the WACC percentile – 4 August 2014 PDF (401 KB)
- Published on 04 August 2014
- Proposed amendment to the WACC percentile for electricity lines services and gas pipeline services – 22 July 2014 PDF (1.2 MB)
- Published on 22 July 2014
- Analyst briefing – Proposed amendment to the WACC percentile – 22 July 2014 Microsoft Powerpoint Presentation (2.2 MB)
- Published on 22 July 2014
- Oxera review of submissions on the appropraite WACC percentile – 17 July 2014 PDF (375 KB)
- Published on 22 July 2014
- RAB multiples Analysis for WACC percentile draft decision Microsoft Excel Spreadsheet (21 KB)
- Published on 24 July 2014
Ingo Vogelsang review of Oxera
11/07/2014 (1 documents)
- Ingo Vogelsang – Review of Oxera – 10 July 2014 PDF (474 KB)
- Published on 11 July 2014
Expert reports on the WACC Percentile
23/06/2014 (8 documents)
- Further work on cost of capital input methodologies – Process Update – 23 June 2014 PDF (227 KB)
- Published on 23 June 2014
- Oxera – Review of the 75th percentile approach – 23 June 2014 PDF (1.1 MB)
- Published on 23 June 2014
- Ingo Vogelsang – On the economic effects of allowing a WACC above the midpoint – 12 June 2014 PDF (219 KB)
- Published on 23 June 2014
- Julian Franks – Setting the cost of capital above the mean – 23 June 2014 PDF (62 KB)
- Published on 23 June 2014
- Martin Lally – The Appropriate Percentile for the WACC Estimate – 19 June 2014 PDF (342 KB)
- Published on 23 June 2014
- Economic Insights – Regulatory Precedents for Setting the WACC within a range – 16 June 2014 PDF (759 KB)
- Published on 23 June 2014
- Commerce Commission – Regulatory Incentives and the Cost of Capital Working Paper – 23 June 2014 PDF (561 KB)
- Published on 23 June 2014
- Terms of Reference for expert reports on the WACC percentile PDF (5 MB)
- Published on 18 July 2014
Submissions on process update paper
08/05/2014 (40 documents)
- AECT submission on further work on WACC input methodologies process update paper cover letter 5 May 2014 PDF (103 KB)
- Published on 08 May 2014
- AECT submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (47 KB)
- Published on 08 May 2014
- Air NZ submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (173 KB)
- Published on 08 May 2014
- Air NZ submission on further work on WACC IMs Sudi Sudarsanam expert opinion 5 May 2014 PDF (432 KB)
- Published on 08 May 2014
- AMP Capital submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (148 KB)
- Published on 08 May 2014
- Auckland Airport submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (122 KB)
- Published on 08 May 2014
- BARNZ submission on further work on WACC input methodologies Covec report dated 5 April 2014 PDF (567 KB)
- Published on 08 May 2014
- Chorus submission on further work on WACC IMs CEG report dated 5 May 2014 PDF (1.7 MB)
- Published on 08 May 2014
- Chorus submission on further work on WACC IMs CEG letter 5 May 2014 PDF (252 KB)
- Published on 08 May 2014
- Chorus submission on further work on WACC IMs Tom Hird CV 5 May 2014 PDF (151 KB)
- Published on 08 May 2014
- Chorus submission on further work on WACC IMs Bruce D Grundy CV 5 May 2014 PDF (53 KB)
- Published on 08 May 2014
- Chorus submission on further work on WACC IMs Professor Grundy report 5 May 2014 PDF (74 KB)
- Published on 08 May 2014
- CIAL submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (1.7 MB)
- Published on 08 May 2014
- ENA submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (710 KB)
- Published on 08 May 2014
- ENA submission on further work on WACC IMs Incenta report 5 May 2014 PDF (290 KB)
- Published on 08 May 2014
- MDL submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (90 KB)
- Published on 08 May 2014
- MEUG submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (70 KB)
- Published on 08 May 2014
- MEUG submission on further work on WACC IMs NZIER Report 5 May 2014 PDF (842 KB)
- Published on 08 May 2014
- NZ Airports submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (408 KB)
- Published on 08 May 2014
- NZ Airports submission on further work on WACC IMs UniServices 5 May 2014 PDF (113 KB)
- Published on 08 May 2014
- NZ Airports submission on further work on WACC IMs NERA report 5 May 2014 PDF (797 KB)
- Published on 09 May 2014
- Orion submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (369 KB)
- Published on 08 May 2014
- Orion submission on further work on WACC IMs CEG report 5 May 2014 PDF (1.2 MB)
- Published on 08 May 2014
- Powerco submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (273 KB)
- Published on 08 May 2014
- Powerco submission on further work on WACC IMs NERA cover letter 5 May 2014 PDF (210 KB)
- Published on 08 May 2014
- Powerco submission on further work on WACC IMs NERA report 5 May 2014 PDF (1.8 MB)
- Published on 08 May 2014
- PwC submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (176 KB)
- Published on 08 May 2014
- QIC submission on further work on WACC input methodologies process update paper 1 May 2014 PDF (406 KB)
- Published on 12 May 2014
- Transpower submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (662 KB)
- Published on 08 May 2014
- Transpower submission on further work on WACC IMs Castalia US report 5 May 2014 PDF (224 KB)
- Published on 08 May 2014
- Transpower submission on further work on WACC IMs Castalia report 5 May 2014 PDF (692 KB)
- Published on 08 May 2014
- Transpower submission on further work on WACC IMs Frontier report 5 May 2014 PDF (521 KB)
- Published on 08 May 2014
- Unison submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (186 KB)
- Published on 08 May 2014
- Unison submission on further work on WACC IMs ASEC report 5 May 2014 PDF (2.7 MB)
- Published on 08 May 2014
- Vector submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (212 KB)
- Published on 08 May 2014
- Vector submission on further work on WACC IMs Sapere report 5 May 2014 PDF (1.3 MB)
- Published on 08 May 2014
- Vector submission on further work on WACC IMs PWC letter to Northington 5 May 2014 PDF (141 KB)
- Published on 08 May 2014
- Wellington Electricity Lines Ltd submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (14 MB)
- Published on 08 May 2014
- Wellington Electricity Lines Ltd submission on further work on WACC IMs CEG report 5 May 2014 PDF (307 KB)
- Published on 08 May 2014
- WIAL submission on further work on WACC input methodologies process update paper 5 May 2014 PDF (94 KB)
- Published on 08 May 2014
Request for extensions for submissions
01/05/2014 (2 documents)
- ENA letter requesting extension for submissions on further work on WACC 30 April 2014 PDF (266 KB)
- Published on 01 May 2014
- NZ Airports letter requesting extension for submissions on further work on WACC 30 April 2014 PDF (218 KB)
- Published on 01 May 2014
Process update paper
31/03/2014 (4 documents)
- Further work on cost of capital input methodologies - Process update paper - 31 March 2014 PDF (372 KB)
- Published on 31 March 2014
- [Notice of intention] WACC Amendments to Input Methodologies for Electricity Distribution Services, Gas Pipeline Services, Airports, and Transpower - 31 March 2014 PDF (335 KB)
- Published on 31 March 2014
- Russell McVeagh on behlaf of Vector Commerce Commission obligations regarding WACC IMs review - 21 March 2014 PDF (600 KB)
- Published on 31 March 2014
- Vector cross-submission on Invitation to have your say on the cost of capital input methodologies - 21 March 2014 PDF (310 KB)
- Published on 31 March 2014
Submissions on invitations to have your say on whether the Commission should review or amend the cost of capital input methodologies
14/03/2014 (32 documents)
- AECT Submission on Invitation to have your say on the cost of capital input methodologies 19 March 2014 PDF (245 KB)
- AIC Investments Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (324 KB)
- Air New Zealand Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (98 KB)
- Alpine Energy Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (545 KB)
- Auckland Airport Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (75 KB)
- BARNZ Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (900 KB)
- Carter Holt Harvey Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (92 KB)
- Consumer NZ submission on Invitation to have your say on the cost of capital input methodologies 14 March 2014 PDF (137 KB)
- Contact NZ Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (547 KB)
- EMA Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (535 KB)
- ENA Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (342 KB)
- Fonterra Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (498 KB)
- Franks and Ogilvie on behalf of MEUG Is the Commerce Commission obliged to amend or review the cost of capital input methodology 13 March 2014 PDF (496 KB)
- Frontier Economics on behalf of Transpower Evidence in support of setting allowed rates of return above the midpoint of the WACC range 13 March 2014 PDF (664 KB)
- Genesis Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (69 KB)
- Grey Power Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (75 KB)
- Horizon Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (97 KB)
- MDL Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (122 KB)
- Meridian Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (75 KB)
- MEUG Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (177 KB)
- MGUG Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (268 KB)
- NZ Airports Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (476 KB)
- NZIER on behalf of MEUG Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (410 KB)
- Orion Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (169 KB)
- Pacific Aluminium Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (179 KB)
- Powerco Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (322 KB)
- Transpower Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (393 KB)
- Unison Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (185 KB)
- Vector Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (436 KB)
- Wellington Airport Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (63 KB)
- Wellington Electricity Lines Limited Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (2.8 MB)
- Winstone Pulp International Submission on Invitation to have your say on the cost of capital input methodologies 13 March 2014 PDF (319 KB)
Invitation to have your say on whether the Commission should review or amend the cost of capital input methodologies
20/02/2014 (1 documents)
Requests for consideration of WACC range
07/02/2014 (2 documents)