We have determined the individual price-quality path that applies to Transpower from 1 April 2015 to 31 March 2020 (Regulatory Control Period 2). This includes Transpower’s forecast maximum allowable revenue, expenditure allowances, and required quality standards.
Please see below for the latest consolidated individual price-quality path determination, amendment decisions and other related documents.
Documents
Consolidated Transpower individual price-quality path determination 2015 incorporating all amendments as at 13 December 2017
22/12/2017 (1 documents)
- Consolidated Transpower individual price quality path determination 2015 – 22 December 2017 PDF (1.2 MB)
- Published on 22 December 2017
Amendments to asset health pilot reporting requirements
08/12/2017 (2 documents)
- [2017] NZCC 29 Transpower individual price-quality path amendment determination 2017 (No. 2) – 6 December 2017 PDF (709 KB)
- Published on 08 December 2017
- Companion paper to amendments to the asset health pilot reporting requirements in the Transpower IPP determination – 6 December 2017 PDF (219 KB)
- Published on 08 December 2017
Submissions on consultation on amendments to asset health pilot reporting requirements
10/11/2017 (2 documents)
- Transpower – Submission on consultation on amendments to asset health pilot reporting requirements – 9 November 2017 PDF (561 KB)
- Published on 10 November 2017
- Vector – Submission on consultation on amendments to asset health pilot reporting requirements – 9 November 2017 PDF (254 KB)
- Published on 10 November 2017
2017 update to the forecast MAR
03/11/2017 (1 documents)
Consultation on amendments to asset health pilot reporting requirements
24/10/2017 (2 documents)
- Proposed amendments asset health pilot reporting requirements – Consultation paper – 25 October 2017 PDF (164 KB)
- Published on 25 October 2017
- Transpower's proposed asset health pilot report – 31 July 2017 PDF (1.1 MB)
- Published on 25 October 2017
Transpower Central Park/Wilton B reconductoring listed project – Final decision
28/06/2017 (1 documents)
Transpower Central Park/Wilton B reconductoring listed project – submissions on draft decision
05/05/2017 (5 documents)
- Notification email – submissions received on CPK/WIL draft decision – 5 May 2017 PDF (124 KB)
- Published on 05 May 2017
- Meridian – Submission on CPK/WIL draft decision – 4 May 2017 PDF (159 KB)
- Published on 05 May 2017
- MEUG – Submission on CPK/WIL draft decision – 4 May 2017 PDF (90 KB)
- Published on 05 May 2017
- NZIER – attachment to MEUG submission on CPK/WIL draft decision – 4 May 2017 PDF (453 KB)
- Published on 05 May 2017
- Transpower – Submission on CPK/WIL draft decision – 4 May 2017 PDF (732 KB)
- Published on 05 May 2017
Transpower Central Park/Wilton B reconductoring listed project – draft decision
13/04/2017 (3 documents)
- Notification email – raw workings available for CPK/WIL – 28 April 2017 PDF (66 KB)
- Published on 05 May 2017
- Notification email – publication of draft decision on CPK/WIL – 13 April 2017 PDF (126 KB)
- Published on 05 May 2017
- Transpower Central Park/Wilton reconductoring project – draft decision – 13 April 2017 PDF (820 KB)
- Published on 13 April 2017
Transpower Central Park/Wilton B reconductoring listed project – application
09/03/2017 (11 documents)
- Notification email – Central Park/Wilton reconductoring project – 10 March 2017 PDF (305 KB)
- Published on 13 March 2017
- Transpower application cover letter – Central Park/Wilton B reconducting project – February 2017 PDF (239 KB)
- Published on 10 March 2017
- Transpower application – Central Park/Wilton B reconducting project – February 2017 PDF (1019 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment A Condition assessment – February 2017 PDF (1.1 MB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment B Options and costing report – February 2017 PDF (642 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment C Wellington Electricity submission – 22 January 2016 PDF (198 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment D Response to WE submission – 15 September 2016 PDF (223 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment E Wellington Electricity submission – 31 January 2017 PDF (409 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment F Meridian submission – 31 January 2017 PDF (135 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment G Annual cost summary – February 2017 PDF (57 KB)
- Published on 10 March 2017
- Transpower – Central Park/Wilton B reconducting project – Attachment H Chief Executive certification – February 2017 PDF (325 KB)
- Published on 10 March 2017
Amendment to Transpower individual price-quality path 2015-2020
03/11/2016 (3 documents)
- [2016] NZCC 23 Transpower Individual Price-Quality Path Amendment Determination 2016 (MAR update November 2016) – 31 October 2016 PDF (1.3 MB)
- Published on 03 November 2016
- Consolidated Transpower Individual Price Quality Path Determination 2015 – 3 November 2016.pdf PDF (381 KB)
- Published on 03 November 2016
- [2016] NZCC 16 Transpower Individual Price-Quality Path Amendment Determination 2016 – 22 August 2016 PDF (829 KB)
- Published on 25 August 2016
Submissions on draft amendment to Transpower's individual price-quality path determination – exemptions and modifications to information disclosure requirements
17/08/2016 (2 documents)
- MEUG – submission on draft amendment to Transpower's individual price-quality path determination – 1 August 2016 PDF (83 KB)
- Published on 17 August 2016
- WEL Networks – submission on draft amendment to Transpower's individual price-quality path determination – 1 August 2016 PDF (142 KB)
- Published on 17 August 2016
Draft amendment to Transpower’s individual price-quality path – exemptions and modifications to information disclosure requirements
18/07/2016 (2 documents)
- [Draft] Transpower Individual Price-Quality Path Amendment Determination 2016 – 18 July 2016 PDF (337 KB)
- Published on 18 July 2016
- Notification email – Draft Amendment to Transpower's IPP – 18 July 2016 PDF (297 KB)
- Published on 18 July 2016
2015 update to the forecast MAR
11/11/2015 (3 documents)
- [2015] NZCC 29 Transpower Individual Price-Quality Path Amendment Determination 2015 – 5 November 2015 PDF (490 KB)
- Published on 11 November 2015
- Consolidated Transpower Individual Price-Quality Path Determination 2014 – 11 November 2015 PDF (355 KB)
- Published on 11 November 2015
- Companion paper to the update of Transpowers maximum allowable revenues 2015 – 5 November 2015 PDF (212 KB)
- Published on 11 November 2015
Final Transpower individual price-quality path determination
28/11/2014 (2 documents)
- [2014] NZCC 35 Final Transpower Individual Price-Quality Path Determination – 28 November 2014 PDF (748 KB)
- Published on 28 November 2014
- Companion paper to final Transpower Individual Price-Quality Path Determination – 28 November 2014 PDF (358 KB)
- Published on 28 November 2014
Transpower’s response to information gathering notice
27/11/2014 (3 documents)
- Transpower's RCP2 revenue calculation – 14 November 2014 Microsoft Excel Spreadsheet (407 KB)
- Published on 27 November 2014
- Transpower's RCP2 revenue calculation – 14 November 2014 PDF (351 KB)
- PwC forecast MAR assurance report – 14 November 2014 PDF (2.4 MB)
- Published on 27 November 2014
Information gathering notice issued to Transpower
27/11/2014 (1 documents)
- 53ZD notice for forecast MAR calculation – 12 September 2014 PDF (3.7 MB)
- Published on 27 November 2014
Submissions on legal drafting of revised draft determination
02/10/2014 (3 documents)
- Consultation paper for cross-submissions on Transpower's submission on final drafting for IPP regulation for RCP2 – 14 October 2014 PDF (337 KB)
- Published on 14 October 2014
- Transpower submission on legal drafting of revised draft determination – 26 September 2014 PDF (448 KB)
- Published on 02 October 2014
- Transpower submission on legal drafting of revised draft determination – Appendix A – 26 September 2014 PDF (1.1 MB)
- Published on 02 October 2014
Final draft Transpower individual price-quality path determination
12/09/2014 (3 documents)
- Covering paper – Final draft Transpower Individual Price-Quality Path Determination – 12 September 2014 PDF (149 KB)
- Published on 12 September 2014
- Final draft Transpower Individual Price-Quality Path Determination – 12 September 2014 PDF (351 KB)
- Published on 12 September 2014
- Final draft Transpower Individual Price-Quality Path Determination – 12 September 2014 Microsoft Word Document (146 KB)
- Published on 12 September 2014
Final decision on individual price-quality path
29/08/2014 (3 documents)
- Setting Transpower's individual price-quality path for 2015–2020 – final decisions and reasons – [2014] NZCC 23 – 29 August 2014 PDF (2.4 MB)
- Published on 29 August 2014
- Strata – Review of points raised in submissions on the draft decision – 19 August 2014 PDF (1.4 MB)
- Published on 29 August 2014
- Final base capex and opex allowances for RCP2 Microsoft Excel Spreadsheet (1.6 MB)
- Published on 29 August 2014
Correspondence prior to decision on setting Transpower’s individual price-quality path
30/07/2014 (1 documents)
- Electricity Authority response (submission) on Demand response – 28 July 2014 PDF (744 KB)
- Published on 30 July 2014
Cross-submissions on asset health grid output measures
18/07/2014 (1 documents)
- Transpower cross-submission on asset health measures – 18 July 2014 PDF (268 KB)
- Published on 18 July 2014
Proposed drafting to give effect to RCP2 asset health grid output measures
14/07/2014 (1 documents)
- Proposed drafting to give effect to RCP2 asset health grid output measures – 14 July 2014 PDF (228 KB)
- Published on 14 July 2014
Cross-submissions on draft decision
14/07/2014 (6 documents)
- MEUG cross-submission on draft decision – 11 July 2014 PDF (96 KB)
- Published on 14 July 2014
- Pacific Aluminium cross-submission on draft decision – 11 July 2014 PDF (93 KB)
- Published on 14 July 2014
- Port Taranaki cross-submission on draft decision – 17 July 2014 PDF (69 KB)
- Published on 25 July 2014
- Powerco cross-submission on draft decision – 11 July 2014 PDF (86 KB)
- Published on 14 July 2014
- Transpower cover letter – cross-submission on draft decison – 11 July 2014 PDF (156 KB)
- Published on 14 July 2014
- Transpower cross-submission on draft decision – 11 July 2014 PDF (692 KB)
- Published on 14 July 2014
Submissions on draft determination
14/07/2014 (2 documents)
- Genesis Energy submission on Transpower's IPP determination – 11 July 2014 PDF (42 KB)
- Published on 14 July 2014
- Transpower submission on Transpower's IPP determination – 11 July 2014 PDF (511 KB)
- Published on 14 July 2014
Submissions on asset health grid output measures
14/07/2014 (1 documents)
- MEUG submission on asset health grid output measures – 11 July 2014 PDF (79 KB)
- Published on 14 July 2014
Draft decision on asset health grid output measures
03/07/2014 (1 documents)
Submissions on Transpower RCP2 draft decision
30/06/2014 (23 documents)
- Carter Holt Harvey Pulp & Paper Ltd submission on individual price-quality path draft decision – 27 June 2014 PDF (81 KB)
- Published on 30 June 2014
- Contact Energy submission on individual price-quality path draft decision – 27 June 2014 PDF (303 KB)
- Published on 30 June 2014
- Counties Power submission on individual price-quality path draft decision – 27 June 2014 PDF (1.5 MB)
- Published on 30 June 2014
- EnerNOC submission on individual price-quality path – 27 June 2014 PDF (92 KB)
- Published on 30 June 2014
- Meridian submission on individual price-quality path draft decision – 27 June 2014 PDF (140 KB)
- Published on 30 June 2014
- MEUG submission on individual price-quality path draft decision – 27 June 2014 PDF (245 KB)
- Published on 30 June 2014
- Pacific Aluminium submission on individual price-quality path draft decision – 27 June 2014 PDF (162 KB)
- Published on 30 June 2014
- Vector submission on individual price-quality path draft decision – 27 June 2014 PDF (181 KB)
- Published on 30 June 2014
- Transpower submission on individual price-quality path draft decision – 27 June 2014 PDF (1.5 MB)
- Published on 30 June 2014
- Transpower – PD30 – POD Otahuhu Wiri Transmission Capacity – 27 June 2014 PDF (581 KB)
- Published on 30 June 2014
- Transpower – PD33 – POD Bus Section Fault Reliability – 27 June 2014 PDF (496 KB)
- Published on 30 June 2014
- Transpower – PD37 – POD North Taranaki Transmission Capacity – 27 June 2014 PDF (623 KB)
- Published on 30 June 2014
- Transpower – PD41 – POD – Hororata and Kimberley voltage quality – 27 June 2014 PDF (514 KB)
- Published on 30 June 2014
- Transpower – PD42 – POD Islington Spare Transformer Switchgear – 27 June 2014 PDF (480 KB)
- Published on 30 June 2014
- Transpower – PD43 – POD Haywards Local Service Third Incomer – 27 June 2014 PDF (495 KB)
- Published on 30 June 2014
- Transpower – PD44 – POD E and D Other – 27 June 2014 PDF (459 KB)
- Published on 30 June 2014
- Transpower – Cash flow-adjusted revenue formulae – 27 June 2014 PDF (568 KB)
- Published on 30 June 2014
- Transpower – Cost escalation forecasts – Frameworks, forecasts and forecast methods NZIER – 27 June 2014 PDF (718 KB)
- Published on 30 June 2014
- Transpower – Demand Response RCP2 submission – 27 June 2014 PDF (653 KB)
- Published on 30 June 2014
- Transpower – Enhancement and Development Base Capex – response to draft decision – 25 June 2014 PDF (1.1 MB)
- Published on 30 June 2014
- Transpower – Substation Management Systems – Business case – 27 June 2014 PDF (869 KB)
- Published on 30 June 2014
- Transpower – Final RCP2 Revised Financial Schedules – 27 June 2014 Microsoft Excel Spreadsheet (1.4 MB)
- Published on 30 June 2014
- Transpower – MD17 – Model – Asset Health and Volume Delivery Incentive Regime – 27 June 2014 Microsoft Excel Spreadsheet (166 KB)
- Published on 30 June 2014
Draft Transpower Individual Price-Quality Path Determination
30/05/2014 (3 documents)
- Reporting Compliance with Transpower s individual price quality path for 2015 2020 Companion and draft decision paper 30 May 2014 PDF (701 KB)
- Published on 30 May 2014
- Draft Transpower Individual Price Quality Path Determination 30 May 2014 PDF (1.2 MB)
- Published on 30 May 2014
- Draft Transpower Individual Price Quality Path Determination 30 May 2014 Microsoft Word Document (142 KB)
- Published on 30 May 2014
Draft decision on individual price-quality path
16/05/2014 (7 documents)
- Setting Transpower's individual price-quality path for 2015-2020 - Reasons for draft decision 16 May 2014 PDF (1.5 MB)
- Published on 16 May 2014
- Strata Technical Advisor Report on the Transpower New Zealand Limited IPP Proposal for RCP2 - 16 May 2014 PDF (4.9 MB)
- Published on 16 May 2014
- RCP2 - Draft opex and Base capex allowances - Calculation spreadsheet from Transpower Microsoft Excel Spreadsheet (1.4 MB)
- Published on 16 May 2014
- RCP2 - Questions from Commission to Transpower Q001 - Q075 PDF (1 MB)
- Published on 16 May 2014
- Commerce Commission letter to the Electricity Authority regarding Demand Response 22 April 2014 PDF (314 KB)
- Published on 16 May 2014
- Electricity Authority letter regarding Transpower's demand response programme 14 April 2014 PDF (1.2 MB)
- Published on 16 May 2014
- Partna Consulting Group - Review of Transpower's proposed quality measures 11 April 2014 PDF (753 KB)
- Published on 16 May 2014
Cross-submissions on Transpower RCP2 process and issues paper
11/03/2014 (5 documents)
- Genesis cross-submission on Transpower RCP2 process and issues paper 10 March 2014 PDF (97 KB)
- Published on 11 March 2014
- MEUG cross-submission on Transpower RCP2 process and issues paper 10 March 2014 PDF (125 KB)
- Published on 11 March 2014
- Powerco cross-submission on Transpower RCP2 process and issues paper 10 March 2014 PDF (214 KB)
- Published on 11 March 2014
- Transpower cross-submission on Transpower RCP2 process and issues paper cover letter 10 March 2014 PDF (228 KB)
- Published on 11 March 2014
- Transpower cross-submission on Transpower RCP2 process and issues paper 10 March 2014 PDF (374 KB)
- Published on 11 March 2014
Submissions on Transpower RCP2 process and issues paper
04/03/2014 (4 documents)
- Carter Holt Harvey submission on Transpower RCP2 process and issues paper 3 March 2014 PDF (133 KB)
- Published on 04 March 2014
- Meridian submission on Transpower RCP2 process and issues paper 3 March 2014 PDF (92 KB)
- Published on 04 March 2014
- MEUG submission on Transpower RCP2 process and issues paper 3 March 2014 PDF (94 KB)
- Published on 04 March 2014
- Transpower submission on Transpower RCP2 process and issues paper 3 March 2014 PDF (1.4 MB)
- Published on 04 March 2014
Issues paper for setting Transpower's individual price-quality path from 2015-2020
10/02/2014 (1 documents)
- Issues paper for setting Transpower's individual price quality path for RCP2 10 February 2014 PDF (835 KB)
- Published on 10 February 2014
Transpower's expenditure proposal for Regulatory Control Period 2015-2020
16/12/2013 (3 documents)
- Transpower expenditure proposal for RCP2 cover letter 2 December 2013 PDF (331 KB)
- Published on 03 December 2013
- Transpower Expenditure proposal for Regulatory Control Period 2 dated December 2013 PDF (2.7 MB)
- Published on 03 December 2013
- Transpower RCP2 Proposal Document Index Microsoft Excel Spreadsheet (59 KB)
- Published on 16 December 2013
Process paper for setting Transpower’s individual price-quality path for 2015 to 2020
15/11/2013 (1 documents)
- Process paper for setting Transpower's individual price quality path for 2015 to 2020 15 November 2013 PDF (73 KB)
- Published on 15 November 2013
Information Requested from Transpower for Regulatory Control Period 2015-2020
04/07/2013 (2 documents)
- Commission letter to Transpower re information gathering notice 2 July 2013 PDF (428 KB)
- Published on 04 July 2013
- Information gathering notice for Transpower RCP2 opex information 2 July 2013 PDF (6.4 MB)
- Published on 04 July 2013