Section 72 of the Amendment Act required that the Commission review a range of STDs under section 30R of the Act in order to give effect to changes made by the Amendment Act. These changes were principally concerned with the de-merger of Telecom and new pricing principles for regulated services.
The Commission requested that the Telecommunications Carriers’ Forum (TCF) facilitate an industry led process to agree on the changes. The TCF provided the Commission with a variety proposed changes which formed the basis of the Commission’s review launched on 26 September 2011. The following standard terms determinations were updated by this review:
- the UCLL STD (Decision 609)
- the UCLL co-location STD (Decision 610)
- the UBA STD (Decision 611)
- the UCLL backhaul STD (Decision 626)
- the UBA backhaulSTD (Decision 627)
- the Sub-loop services STD, which includes the SLU UCLL service, SLU co-location service, and SLU backhaul service (Decision 672).
The Commission’s final Decision on Consequential Changes to Commerce Commission Standard Term Determinations was released on 24 November 2011.
Contemporaneous with this review, the Commission completed a separate review, the UCLL averaging review, as required by s73(2)(b) of the Amendment Act. The changes to the UCLL price (to have effect from 3 years from separation), and their flow-through to the UBA price, have been reflected in the revised documents released with this decision.
Marked-up versions of the STDs reflecting the Commission’s decisions may be found on this page.
Important Note: these changes do not take effect until Telecom separates (Separation Day). Current versions of the STDs, as amended by these decisions, will be uploaded following separation.
Current Document
Project Timeline
| Type | Description | Indicative date/s |
|---|---|---|
| Consultation | Proposed changes received from TCF | 26/08/2011 |
| Draft Determination | Draft review decision released | 12/10/2011 |
| Consultation | Submissions on draft review decision received | 28/10/2011 |
| Consultation | Cross-submissions on draft review decision received | 09/11/2011 |
| Final Determination | Final review decision due for release | 24/11/2011 |
Disclaimer
These dates are not official and may change. Please see the Terms and Conditions for further limitations.
Next Steps
Clean versions of STDs with new amendments to published on 1 December 2011
Supporting Documents
Final Decision on Amendments STDs
24/11/2011 (1 document)
Marked up Amendments to UCLL STDs
24/11/2011 (15 documents)
- UCLL BH General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (591 KB) (opens in a new window)
- UCLL BH Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (337 KB) (opens in a new window)
- UCLL BH Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (267 KB) (opens in a new window)
- UCLL BH Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (610 KB) (opens in a new window)
- UCLL Co lo General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (624 KB) (opens in a new window)
- UCLL Co lo Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (194 KB) (opens in a new window)
- UCLL Co lo Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (251 KB) (opens in a new window)
- UCLL Co lo Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (264 KB) (opens in a new window)
- UCLL Co lo Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (1.3 MB) (opens in a new window)
- UCLL Co lo Sch 5 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (174 KB) (opens in a new window)
- UCLL General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (603 KB) (opens in a new window)
- UCLL Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (164 KB) (opens in a new window)
- UCLL Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (251 KB) (opens in a new window)
- UCLL Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (258 KB) (opens in a new window)
- UCLL Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (1.4 MB) (opens in a new window)
Marked up Amendments to UBA STDs
24/11/2011 (10 documents)
- UBA BH General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (566 KB) (opens in a new window)
- UBA BH Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (626 KB) (opens in a new window)
- UBA BH Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (256 KB) (opens in a new window)
- UBA BH Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (271 KB) (opens in a new window)
- UBA BH Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (611 KB) (opens in a new window)
- UBA BH Sch 5 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (278 KB) (opens in a new window)
- UBA General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (864 KB) (opens in a new window)
- UBA Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (209 KB) (opens in a new window)
- UBA Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (572 KB) (opens in a new window)
- UBA Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (275 KB) (opens in a new window)
Marked up Amendments to Sub-loop STD’s
24/11/2011 (14 documents)
- SLU App 1 Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (203 KB) (opens in a new window)
- SLU App 1 Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (273 KB) (opens in a new window)
- SLU App 1 Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (300 KB) (opens in a new window)
- SLU App 1 Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (1 MB) (opens in a new window)
- SLU App 2 Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (206 KB) (opens in a new window)
- SLU App 2 Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (262 KB) (opens in a new window)
- SLU App 2 Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (257 KB) (opens in a new window)
- UCLL Co lo Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (1.3 MB) (opens in a new window)
- UCLL Co lo Sch 5 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (174 KB) (opens in a new window)
- UCLL General Terms Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (603 KB) (opens in a new window)
- UCLL Sch 1 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (164 KB) (opens in a new window)
- UCLL Sch 2 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (251 KB) (opens in a new window)
- UCLL Sch 3 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (258 KB) (opens in a new window)
- UCLL Sch 4 Consequentials MARKUP 24 November 2011 Adobe Acrobat PDF (1.4 MB) (opens in a new window)
Further TCF on draft review decision
15/11/2011 (4 documents)
- TCF Letter re End User Terms 15 November 2011 Adobe Acrobat PDF (91 KB) (opens in a new window)
- TCF attachment Chorus End User Terms General Terms edits 15 November 2011 Adobe Acrobat PDF (38 KB) (opens in a new window)
- TCF attachment Chorus End User Terms Business 15 November 2011 Adobe Acrobat PDF (50 KB) (opens in a new window)
- TCF attachment Chorus End User Terms Residential 15 November 2011 Adobe Acrobat PDF (37 KB) (opens in a new window)
Cross-submissions on draft review decision
(12 documents)
- Chorus cross submission on consequential changes STD 9 November 2011 Adobe Acrobat PDF (436 KB) (opens in a new window)
- Chorus Appendix 1 EUTs UCLL GT 9 November 2011 Microsoft Word Document (37 KB) (opens in a new window)
- Chorus Appendix 2 End User Terms Residential 9 November 2011 Microsoft Word Document (70 KB) (opens in a new window)
- Chorus Appendix 3 End User Terms Business 9 November 2011 Microsoft Word Document (72 KB) (opens in a new window)
- Chorus Appendix 4 WSA 9 November 2011 Microsoft Word Document (99 KB) (opens in a new window)
- Chorus Attachment End User Terms Business mark up 9 November 2011 Microsoft Word Document (83 KB) (opens in a new window)
- Chorus Attachment End User Terms Residential mark up 9 November 2011 Microsoft Word Document (83 KB) (opens in a new window)
- TelstraClear cross submission on consequential changes to STDs 9 November 2011 Adobe Acrobat PDF (88 KB) (opens in a new window)
- Vector cross submission on consequential changes to STDs 9 November 2011 Adobe Acrobat PDF (129 KB) (opens in a new window)
- Vodafone cross submission on draft consequential changes STDs 9 November 2011 Adobe Acrobat PDF (429 KB) (opens in a new window)
- Vodafone attachment Chorus End User Terms Business 9 November 2011 Microsoft Word Document (69 KB) (opens in a new window)
- Vodafone attachment Chorus End User Terms Residential marked up 9 November 2011 Microsoft Word Document (74 KB) (opens in a new window)
Submissions on draft review decision
(6 documents)
- Chorus submission on consequential changes review 28 October 2011 Adobe Acrobat PDF (478 KB) (opens in a new window)
- TCF submission on consequential changes review 28 October 2011 Adobe Acrobat PDF (100 KB) (opens in a new window)
- Attachment to TCF submission on consequential changes review 28 October 2011 Review Table Industry Feedback Adobe Acrobat PDF (188 KB) (opens in a new window)
- TelstraClearsubmission on consequential changes review 27 October 2011 Adobe Acrobat PDF (127 KB) (opens in a new window)
- Vector submission on consequential changes review 28 October 2011 Adobe Acrobat PDF (130 KB) (opens in a new window)
- Vodafone submission on consequential changes review 28 October 2011 Adobe Acrobat PDF (363 KB) (opens in a new window)
Draft decision on amendments to STDs
(1 document)
Draft amendments to UBA STDs
(11 documents)
- DRAFT UBA General Terms Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (1 MB) (opens in a new window)
- DRAFT UBA Schedule 1 Service Description Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (210 KB) (opens in a new window)
- DRAFT UBA Schedule 2 Price List Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (621 KB) (opens in a new window)
- DRAFT UBA Schedule 3 Service Level Terms Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (299 KB) (opens in a new window)
- DRAFT UBA Schedule 4 Operations Manual Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (981 KB) (opens in a new window)
- DRAFT UBA Backhaul General Terms Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (606 KB) (opens in a new window)
- DRAFT UBA Backhaul Schedule 1 Service Description Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (641 KB) (opens in a new window)
- DRAFT UBA Backhaul Schedule 2 Price List Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (273 KB) (opens in a new window)
- DRAFT UBA Backhaul Schedule 3 Service Level Terms Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (291 KB) (opens in a new window)
- DRAFT UBA Backhaul Schedule 4 Operations Manual Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (794 KB) (opens in a new window)
- DRAFT UBA Backhaul Schedule 5 POI Site Info. Consequential Amendments Track Changes 12 October 2011 Adobe Acrobat PDF (297 KB) (opens in a new window)
Draft amendments to UCLL STDs
(16 documents)
- DRAFT UCLL General Terms Consequential Amendments Track Changes Adobe Acrobat PDF (645 KB) (opens in a new window)
- DRAFT UCLL Schedule 1 Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (215 KB) (opens in a new window)
- DRAFT UCLL Schedule 2 Price List Consequential Amendments Track Changes Adobe Acrobat PDF (265 KB) (opens in a new window)
- DRAFT UCLL Schedule 3 Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (296 KB) (opens in a new window)
- DRAFT UCLL Schedule 4 Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (1.5 MB) (opens in a new window)
- DRAFT UCLL Backhaul General Terms Consequential Amendments Track Changes Adobe Acrobat PDF (629 KB) (opens in a new window)
- DRAFT UCLL Backhaul Schedule 1 Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (342 KB) (opens in a new window)
- DRAFT UCLL Backhaul Schedule 2 Price List Consequential Amendments Track Changes Adobe Acrobat PDF (383 KB) (opens in a new window)
- DRAFT UCLL Backhaul Schedule 3 Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (291 KB) (opens in a new window)
- DRAFT UCLL Backhaul Schedule 4 Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (616 KB) (opens in a new window)
- DRAFT UCLL Co location General Terms Consequential Amendments Track Changes Adobe Acrobat PDF (647 KB) (opens in a new window)
- DRAFT UCLL Co location Schedule 1 Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (231 KB) (opens in a new window)
- DRAFT UCLL Co location Schedule 2 Price List Consequential Amendments Track Changes Adobe Acrobat PDF (264 KB) (opens in a new window)
- DRAFT UCLL Co location Schedule 3 Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (283 KB) (opens in a new window)
- DRAFT UCLL Co location Schedule 4 Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (1.4 MB) (opens in a new window)
- DRAFT UCLL Co location Schedule 5 Access Consequential Amendments Track Changes Adobe Acrobat PDF (196 KB) (opens in a new window)
Draft amendments to Sub-loop STDs
(15 documents)
- DRAFT SLU General Terms Consequential Amendments Track Changes Adobe Acrobat PDF (740 KB) (opens in a new window)
- DRAFT SLU Appendix 1 Schedule 1 Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (223 KB) (opens in a new window)
- DRAFT SLU Appendix 1 Schedule 2 Price List Consequential Amendments Track Changes Adobe Acrobat PDF (293 KB) (opens in a new window)
- DRAFT SLU Appendix 1 Schedule 3 Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (322 KB) (opens in a new window)
- DRAFT SLU Appendix 1 Schedule 4 Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (1.1 MB) (opens in a new window)
- DRAFT SLU Appendix 2 Schedule 1 Co location Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (217 KB) (opens in a new window)
- DRAFT SLU Appendix 2 Schedule 2 Co location Price List Consequential Amendments Track Changes Adobe Acrobat PDF (282 KB) (opens in a new window)
- DRAFT SLU Appendix 2 Schedule 3 Co location Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (286 KB) (opens in a new window)
- DRAFT SLU Appendix 2 Schedule 4 Co location Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (1 MB) (opens in a new window)
- DRAFT SLU Appendix 2 Schedule 5 Co location Access Consequential Amendments Track Changes Adobe Acrobat PDF (188 KB) (opens in a new window)
- DRAFT SLU Appendix 3 Schedule 1 Backhaul Service Description Consequential Amendments Track Changes Adobe Acrobat PDF (214 KB) (opens in a new window)
- DRAFT SLU Appendix 3 Schedule 2 Backhaul Price List Consequential Amendments Track Changes Adobe Acrobat PDF (242 KB) (opens in a new window)
- DRAFT SLU Appendix 3 Schedule 3 Backhaul Service Level Terms Consequential Amendments Track Changes Adobe Acrobat PDF (313 KB) (opens in a new window)
- DRAFT SLU Appendix 3 Schedule 4 Backhaul Operations Manual Consequential Amendments Track Changes Adobe Acrobat PDF (512 KB) (opens in a new window)
- DRAFT SLU Implementation Plan Consequential Amendments Track Changes Adobe Acrobat PDF (217 KB) (opens in a new window)
TCF submission of proposed amendments and associated side-letters
(6 documents)
- TCF Letter re consequential STD Amendments 26 August 2011 Adobe Acrobat PDF (104 KB) (opens in a new window)
- Attachment to TCF letter re consequential STD Amendments 26 August 2011 Change Summary Adobe Acrobat PDF (693 KB) (opens in a new window)
- CallPlus and Kordia side letter on Telecoms proposed UBA STD Amendments 1 September 2011 Adobe Acrobat PDF (337 KB) (opens in a new window)
- Chorus side letter on UBA pricing issues 9 September 2011 Adobe Acrobat PDF (2.4 MB) (opens in a new window)
- Chorus2 End User Terms 180811 Adobe Acrobat PDF (38 KB) (opens in a new window)
- Vodafone side letter on UBA price list amendments 2 September 2011 Adobe Acrobat PDF (454 KB) (opens in a new window)
UBA documents submitted by TCF (includes backhaul)
30/09/2011 (11 documents)
- UBA General Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (1.2 MB) (opens in a new window)
- UBA Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (280 KB) (opens in a new window)
- UBA Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (689 KB) (opens in a new window)
- UBA Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (434 KB) (opens in a new window)
- UBA Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (1.1 MB) (opens in a new window)
- UBA Backhaul General Terms consequesntial amendments 26 August 2011 Adobe Acrobat PDF (747 KB) (opens in a new window)
- UBA Backhaul Service Description consequesntial amendments 26 August 2011 Adobe Acrobat PDF (754 KB) (opens in a new window)
- UBA Backhaul Price List consequesntial amendments 26 August 2011 Adobe Acrobat PDF (387 KB) (opens in a new window)
- UBA Backhaul Service Level Terms onsequesntial amendments 26 August 2011 Adobe Acrobat PDF (430 KB) (opens in a new window)
- UBA Backhaul Operations Manual consequesntial amendments 26 August 2011 Adobe Acrobat PDF (830 KB) (opens in a new window)
- UBA Backhaul POI Site Related Information consequesntial amendments 26 August 2011 Adobe Acrobat PDF (400 KB) (opens in a new window)
UCLL documents submitted by TCF (includes co-location and backhaul)
30/09/2011 (17 documents)
- UCLL General Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (758 KB) (opens in a new window)
- UCLL Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (338 KB) (opens in a new window)
- UCLL Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (397 KB) (opens in a new window)
- UCLL Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (430 KB) (opens in a new window)
- UCLL Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (1.7 MB) (opens in a new window)
- UCLL Backhaul Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (468 KB) (opens in a new window)
- UCLL Backhaul General Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (744 KB) (opens in a new window)
- UCLL Backhaul Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (510 KB) (opens in a new window)
- UCLL Backhaul Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (429 KB) (opens in a new window)
- UCLL Backhaul Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (791 KB) (opens in a new window)
- UCLL Backhaul POI Site Related Information consequential amendments 26 August 2011 Adobe Acrobat PDF (878 KB) (opens in a new window)
- Co location General Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (772 KB) (opens in a new window)
- Co location Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (352 KB) (opens in a new window)
- Co location Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (368 KB) (opens in a new window)
- Co location Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (414 KB) (opens in a new window)
- Co location Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (1.6 MB) (opens in a new window)
- Co location Access Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (297 KB) (opens in a new window)
Sub-loop documents submitted by TCF (includes co-location and backhaul)
30/09/2011 (15 documents)
- Sub loop Services General Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (825 KB) (opens in a new window)
- Sub Loop UCLL Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (272 KB) (opens in a new window)
- Sub loop UCLL Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (356 KB) (opens in a new window)
- Sub loop UCLL Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (381 KB) (opens in a new window)
- Sub loop UCLL Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (1.2 MB) (opens in a new window)
- Sub loop Backhaul Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (282 KB) (opens in a new window)
- Sub loop Backhaul Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (296 KB) (opens in a new window)
- Sub loop Backhaul Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (369 KB) (opens in a new window)
- Sub loop Backhaul Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (586 KB) (opens in a new window)
- Sub loop Co location Service Description consequential amendments 26 August 2011 Adobe Acrobat PDF (263 KB) (opens in a new window)
- Sub loop Co location Price List consequential amendments 26 August 2011 Adobe Acrobat PDF (339 KB) (opens in a new window)
- Sub loop Co location Service Level Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (335 KB) (opens in a new window)
- Sub loop Co location Operations Manual consequential amendments 26 August 2011 Adobe Acrobat PDF (1.1 MB) (opens in a new window)
- Sub loop Co location Access Terms consequential amendments 26 August 2011 Adobe Acrobat PDF (234 KB) (opens in a new window)
- Sub loop Services Implementation Plan consequential amendments 26 August 2011 Adobe Acrobat PDF (266 KB) (opens in a new window)